  • Updates for Week of 11/5/18 November 2, 2018
    We will be prepping the lower part of the development Monday Nov 5th. Street sweeping will begin on Monday Evening starting at 3pm.  No Street Parking Mon – Fri between 5am – 7pm.  We will be petro matting, tack coating and paving Tuesday – Friday Nov 6-9. Thank you for your patience and cooperation! The […]
  • Week of 10/29 October 29, 2018
    We are paving this week starting at the top of the Development with Tait, Cale and Fourth Street and Logan Dr from Steltz Rd to Third Street. No Street Parking is allow Monday through Wednesday from 5am to 7pm oi all of these areas. We will be sweeping streets, tack coating, petro matting and paving. Thank you […]
  • Continuing Pipe Flushing October 23, 2018
    The Affordable Paving team will continue pipe flushing on Wednesday, October 24, 2018 on parts of 4t, Kale, Tate, and Logan streets. Paving is scheduled to begin on Monday, October 29th. No parking in these areas with limited access to driveway while paving. The post Continuing Pipe Flushing appeared first on Affordable Paving & Excavating.
  • Koller Pointe Update October 10, 2018
    Cale Drive, Tait Drive, 4th Street and everything on Logan Drive north of fourth Street have all concrete repairs completed except for a few small areas and they will be completed Wednesday, 10/10. All inlets that need addressed throughout the entire development have been replaced or repaired with concrete and they have been cleaned of […]
  • Work continues this weekend September 29, 2018
    Due to Weather delays on this project, Affordable Paving and Excavating is planning on working at Koller Point this weekend Saturday and Sunday 9/29 & 9/30 starting at 7AM. The post Work continues this weekend appeared first on Affordable Paving & Excavating.
  • Week of September 24 September 24, 2018
    Continuing Storm Drain pipe repairs Continuing Base Repair paving on all road in development   Curb Stop repairs will begin on Thursday, October 4, on Fourth Street, Tait Drive, Cale Drive & Logan Drive from Fourth Street to Steltz Rd.  All houses on the list will get a door hanger notifying them of the repair. […]
  • Work on Logan Dr., Broad St. and Third St. Continues September 20, 2018
    On Thursday, Sept 20 we will begin digging up and repairing storm drain pipes in or between the following houses. 2 Logan Dr – in front corner of yard. 106 and 108 Broad Street – In between houses, front yard near curb. 45 & 47 Third Street – In-between houses – towards the back of […]
  • Storm Water Pipe Repairs September 19, 2018
    Starting Wednesday, September 18th, Affordable Paving will be starting storm water pipe repairs on Logan Drive in Koller Pointe. The post Storm Water Pipe Repairs appeared first on Affordable Paving & Excavating.
  • Picking up where we left off Monday, 8/27 August 26, 2018
    The Affordable Paving team picks up where we left off Friday in Koller Point.  On Monday, 8/27 we will back to trench repairs and concrete pouring. Please avoid parking in the work areas marked with pink lines. The post Picking up where we left off Monday, 8/27 appeared first on Affordable Paving & Excavating.
  • Trench Repairs August 24, 2018
    Trench repairs will begin on Logan Drive and all side streets tomorrow, Thursday, 8/24. The post Trench Repairs appeared first on Affordable Paving & Excavating.